This slide is a part of: School Calendars 2015 2016 graphics (US date format, PPT tables and icons)
Timelines, Project plans
Slide Content
The PowerPoint slide is titled "Timelines, Project plans," which implies a focus on tools and methodologies for organizing, tracking, and presenting different stages and elements within a project. This would include timelines depicting key milestones, deadlines, and the sequence of tasks needing completion. Project plans typically encompass a broader scope, detailing resources, budgets, responsibilities, and strategies geared toward achieving the project's goals.
Graphical Look
- The slide has a minimalist and professional design.
- Title is centered at the lower third of the slide, in large white font, on a dark turquoise ribbon-like shape with a fold effect at the right end.
- Background is a light grey with a subtle overlay of white wavy shapes providing a sense of texture or topography.
- No additional graphics, icons, or bullet points visible.
- No footer information is visible.
The slide has a clean and modern aesthetic with a focus on the title for clarity and emphasis. The text is easily readable against the contrasting ribbon shape, while the background texture adds a layer of depth without distracting from the main content.
Use Cases
- To introduce a section on project planning in a business presentation.
- To serve as a title slide before delving into the specifics of project timelines and schedules.
- To preface a strategic meeting where project timelines and milestones will be discussed.
- To visually break up a presentation, clearly indicating a new topic related to project management.
Timelines project plan 2015 2016 powerpoint
Fully editable slide
compatible with PowerPoint, Google Slides, Keynote
This slide can be purchased as a part of a content-ready deck or individually through a subscription