Reviews
Your graphics add a nice touch to my presentations and I recently used them for one of my all-hands meetings. Your toolbox adds professionalism to my slides. Instead of using standard clipart.
I needed a fresh look at some of my slides. I've tried to find a way to create a paintbrush effect, to underline, accentuate, add some color and the handwritten markers were just the things. Very easy to use, easy to size, change the color. It was an affordable, perfect solution and I'm happy to recommend it.
The crisp, clean look of the graphics, and the fact that it allowed me to easily edit and change the colors to match the template was my main reason for purchasing them.
Description
Teams and Project Steps RACI Matrix
Slide Content:
The slide displays a RACI Matrix that cross-references four teams (Team A to Team D) with five project steps to delineate responsibilities. Each cell contains an icon representing one of the RACI categories: Responsible, Accountable, Consulted, or Informed. The matrix is a project management tool used to specify roles and responsibilities, ensuring that all tasks are covered and that team members understand their duties at each project step.
Graphical Look:
- A table with rows labeled Team A to Team D and columns labeled Step 1 to Step 5.
- Icons in circles of different colors representing each RACI category, e.g.: clipboard for Responsible, checkmark for Accountable, group for Contributing, and envelope for Informed.
- A blue header for project steps and an orange header for team labels.
- A side panel in blue with space for a summary title and additional RACI map commentary.
- A human figure with a chart icon representing the concept of project management or RACI mapping.
The slide uses a clean and structured layout with color-coded icons to visually organize information. The distinct headers and side panels provide clarity and space for additional details.
Use Cases:
This slide would be suitable for project management meetings, team briefings, and workshops where the focus is on assigning clear roles and responsibilities for each step of a project. It can be used in both planning stages and throughout project execution to keep all team members informed of their tasks and the overall project progression.
How to Edit
How to edit text & colors

How to expand / shorten diagram

How to Replace Icons in infoDiagram PPT
